Filter search results (83) Project Refurbishment water station, Olero Creek Refurbishment water station, Olero Creek In November 2010 Chevron Nigeria Limited (CNL) awarded the contract to refurbish this facility to Saipem Contracting Nigeria Limited (SCNL) with Nigerian Westminster Dredging and Marine Limited (NWDM) as subcontractor. The Olero Creek Restoration.... The NWS is a concrete gravity based barge with dimension 51.92m x 24.44m x 4.27m. The barge arrived at the NWDM yard in December 2010. Chevron Nigeria Read more Project Port development, Tanger Med 2 Port development, Tanger Med 2 Tanger-Med is a cargo and passenger port located about 40 km east of Tangiers, Morocco, on the Straits of Gibraltar at the crossing of two major maritime routes only 15 km from the European mainland. The port consists of the Tanger Med 1 terminal, which went into service in 2007, a ferry terminal (2009), and the Tanger Med 2 port, which has been under construction since March 2010 and is scheduled Read more Project Channel deepening, Melbourne . The overall success of the project was recognised by the industry through the award of ‘2010 Project of the Year’ by Infrastructure Partnerships Australia Read more Project Reinforcing Dutch coastline, Sandmotor Reinforcing Dutch coastline, Sandmotor In December 2010 Royal Boskalis Westminster N.V. was awarded a contract by the Dutch Directorate General for Public Works and Water Management to reinforce part of the coastline in the province of Zuid-Holland by creating a ‘sand engine’. The total value of the contract is EUR 50 million for the Van Oord- Boskalis consortium, in which Boskalis has a 50% stake. The project entails the creation Read more Page Large-scale transplant of coral Large-scale transplant of coral In Jamaica, between August 2009 and April 2010, coral was transplanted as part of the development of the Falmouth Cruise Ship Terminal. The ecological challenge One of the requirements of the National Environmental Protection Agency was the movement of the coral threatened by the work. Before the entrance channel to the port could be deepened, 24 different types of hard coral had to be transplanted: 150,000 Read more Page Supervisory board ), deputy chairman date of first appointment 27 March 2010, current term ends AGM 2020 former chairman of the Management Board of Royal Volker Wessels Stevin Read more Previous 10 11 12 13 14 Next