Project
Smart
the port of Richards Bay, South Africa heading for China. Soon, however, the swell became too much and the vessel grounded next to the channel, less than... that was still in holds 8 and 9 had to be discharged to refloat the aft section. This was done with specialized dredging pumps operated from a chartered DP vessel. In addition, a specially designed steel structure was placed and welded onto the casualties deck for a mobile crane to facilitate access