Project
Seaton Regeneration Project
Seaton Regeneration Project Approximately 246,000m3 of dredged material was required to raise the level of a 100,000m2 development in the coastal town of Seaton, Devon. Due it’s low lying position, planning conditions for construction dictated that the land must be raised by approximately 2m..., Oranje, was used to pump ashore the material, dredged offshore from South Wales into the reclamation, along 1.5miles of steel pipeline. The pipeline