Filter search results (94) Project PVD installation for Belfast Docks, Northern Ireland PVD installation for Belfast Docks, Northern Ireland Cofra Ltd installed 200,000m1 of vertical drain on this new dock extension/development works in 2011. PVD installation is part of our segment consolidation. Belfast Read more Project Tyne Capital Dredging Tyne Capital Dredging The 2011 campaign project, performed by Westminster Dredging, consisted of capital dredging. The River Tyne was dredged from the harbour entrance over a distance of 5.5km to a depth of -10m CD. Furthermore the berth on the south bank (Tyne Bulk Terminal) was dredged... these operations. The dredging campaign was finished on July 26th 2011. Port of Tyne Westminster Dredging Company Ltd Read more Project Felixstowe Coastal Protection Scheme Felixstowe Coastal Protection Scheme This contract, awarded in July 2011, comprised beach recharge, rock structures, timber structures and concrete works. The works awarded to Westminster included 80,000m3 of new beach material and the construction of eighteen rock groynes. Initially... by November 2011. Suffolk Coastal Protection Scheme Volker Stevin Westminster Dredging Company Ltd Read more Project Offshore PVD installation for Quay 16 extension, Beirut Offshore PVD installation for Quay 16 extension, Beirut In 2011, we installed 190,000m1 of prefabricated vertical drain from a barge, with an installation depth up to 52m. PVD installation is part of our segment consolidation. Beirut Read more Project CDC compaction for New Cities project Kuwait CDC compaction for New Cities project Kuwait We have performed the ironing after Dynamic replacement and compaction of suitable areas for the new cities project in Kuwait. In total an area of 3,800,000m2 was compacted using CDC hammer in 2011. Kuwait city Read more Project CDC compaction for Barrow Island LNG terminal project CDC compaction for Barrow Island LNG terminal project We have compacted the EMOF facility of the Barrow Island LNG facility at Barrow Island Australia in 2011. On a very remote location, under strict environmental regulations, we were able to compact 145,000m2 of reclamation. Barrow Island Read more Previous 9 10 11 12 13 Next