Project
Port development, Mombasa
for the dredging and reclamation works for the first construction phase for the second container terminal. Before construction of the quay walls, three..., the soil improvement area was filled with offshore sand by TSHD Willem van Oranje and a spray pontoon. Reclamation had to take place very carefully to avoid mud slides and circular slip. During reclamation to +1 m CD, the spray pontoon SP10, positioned on six anchors, was used to apply layers of 75