Filter search results (90) Project Redevelopment Waterfront, Harderwijk earthmoving equipment. The work began in the first quarter of 2012 and it will take at least six years. Municipality of Harderwijk Harderwijk Read more Project Port construction, Khalifa port to the mainland by causeways and bridges. Khalifa Port is scheduled to replace Mina Zayed by late 2012 and provides infrastructure for a wide range Read more Project Dredging, Sealine COEFR started on the project in December 2012 with dredging of the three trenches by TSHD Oranje. The three trenches have a total length of 21 km and were Read more Project Land reclamation artificial island, Punta Pacifica 2012, the island was ready for filling with sand. Ocean Reef Islands Inc. Punta Pacifica, Panama City, Panama Boskalis Panama SA Read more Page Large-scale transplant of coral . The results were presented at an international coral research conference in Australia in 2012. Aan het Also of interest element zodra mogelijk ook Read more Project Jin Tai Jin Tai The beginning of 2012 involved the salvage case of the backacter bucket dredger ‘JIN TAI’. This backhoe dredger was working on the construction and expansion of the newly built container port of Coega near Port Elizabeth (South Africa), when it experienced a problem with one of the vessels’ legs. A cable attached to one of the three spud piles came loose, causing one of the legs to give way and the engine room start flooding. Read more Previous 11 12 13 14 15 Next