Filter search results (131) Project Clacton and Holland on Sea Coastal Defence Scheme Clacton and Holland on Sea Coastal Defence Scheme This coastal protection project for Tendring District Council was awarded to VBA JV Ltd in May 2014. VBA is a consortium comprising VolkerStevin, Boskalis Westminster and Atkins that was established to secure works through the Water and Environmental Management Framework (WEM). The frontage at Clacton and Holland-on-Sea is located on a south-easterly facing section of the Essex coastline Read more Project Port upgrade, Genoa . The project started in 2009 and will be completed in early 2014. Working on the first reclamation area A1 from July 2009 to September 2009. Construction..., the last part of Calata Bettolo, early 2014. Environmental challenges An important part of the project consisted of dredging 2.2 million m3 Read more Press release Boskalis: Very busy first half year with historically high profit in the capacity-driven short-term marketsTowage: stable market prospectsNet profit outlook: FY 2015 net profit lower than 2014 record of EUR 490 million Royal Boskalis Westminster N.V. (Boskalis) realized a net profit of EUR 306.5 million in the first half of 2015, a rise of 21% (H1 2014: EUR 253.0 million). Revenue in the first half of the year rose 1.6% to EUR 1.57 billion (H1 2014: EUR 1.55 billion). Adjusted for (de)consolidation and currency Read more Press release Boskalis: Very busy first half year with historically high profit in the capacity-driven short-term marketsTowage: stable market prospectsNet profit outlook: FY 2015 net profit lower than 2014 record of EUR 490 million Royal Boskalis Westminster N.V. (Boskalis) realized a net profit of EUR 306.5 million in the first half of 2015, a rise of 21% (H1 2014: EUR 253.0 million). Revenue in the first half of the year rose 1.6% to EUR 1.57 billion (H1 2014: EUR 1.55 billion). Adjusted for (de)consolidation and currency Read more Project Dredging and reclamation, Songdo International City to be completed by late 2014. Boskalis’ strategy is aimed at benefitting from key macro-economic factors which drive worldwide demand in our markets Read more Project Coastal development, Hondsbossche and Pettemer Sea Defense on since March 2014, with large quantities of sand having been dumped and rainbowed just off the coast. Beach replenishment work started in July... 2014. The safety of our coastline must be back up to standard by 31 December 2015. After the sand is in place the joint venture will still be busy Read more Previous 14 15 16 17 18 Next