Filter search results (171) Press release Boskalis joint venture awarded dredging contract for Santos port, Brazil . Subsequent dredging operations are expected to commence later this year with the deployment of various trailing suction hopper dredgers and a backhoe dredger. The dredging activities are expected to be completed in 2018. FOR FURTHER INFORMATION Investor relations:Martijn L.D. Read more Project Port access channel dredging, Walvis Bay . A total of 1.8 million m3 of material was dredged during the four-month execution period. All the dredging works were executed with a Trailing Suction Hopper Dredger. The first TSHD deployed on site was the Argonaut, which was followed by the Cornelis Zanen halfway through the project. These vessels Read more Project Subsea pipeline repair, Bukom SBM section using the Trailing Suction Hopper Dredger (TSHD) Queen of the Netherlands with a ripper draghead well in advance of the actual trench dredging Read more Project Provision and installation of submarine fiber optic cable, Strait of Magellan make for a challenging operating environment. Boskalis will execute this project together with subcontractor Alcatel Lucent. A large trailing suction hopper dredger and a seagoing cable-laying vessel will be deployed for this turnkey project. The cable will be trenched, using both a jetting sledge Read more Project Harwich Maintenance Dredging m³, completed over four or five campaigns throughout the year. Each campaign takes approximately three weeks, with a trailing suction hopper dredger Read more Project Cowes Outer Harbour Breakwater the breakwater’s gravel core up to between 4 and 5 metres above chart datum, using a trailing suction hopper dredger, floating pipeline and spraying Read more Previous 18 19 20 21 22 Next