Filter search results (269) Project Rock installation, PDET the Boskalis NINA (No Injuries No Accidents) program was implemented; all truck drivers and other personnel were successfully trained and explained the values Read more Project Salvage operation, Full City fuel oils and other pollutants out of the holds and tanks by means of skimming and pumping. The recovered pollutants were transported to shore Read more Project Dredging and reclamation, Port of Peterhead , together with split hoppers Long Sand and Cork Sand. Other associated works included the demolition of the western end of the existing Albert Quay before Read more Project Construction drilling island and ice barriers, Kazakhstan with a total length of 450 meters and 20 meters wide, and the other measuring more than 550 meters. BAVOF also built Riser Island, measuring 550 x 90 meters Read more Project Redevelopment Waterfront, Harderwijk . Boskalis is responsible for the earthworks and the infrastructure. TBI will manage the construction of the residential properties and other buildings Read more Project Port maintenance, Açu Port with the changing requirements of the client and other stakeholders such as the future concessionaries of the Port of Açu. Based on continuous interaction Read more Previous 22 23 24 25 26 Next