Filter search results (322) Project Port development, Cherbourg were constructed at the same time: one with a water depth of 14 m and the other with a depth of 10 m. A turning circle in front of the new quay Read more Project NASR full field development , was mobilized to Abu Dhabi in 2017 for the jacket installations, thereafter demobilized to NW-Europe for other work and then re-mobilized to Abu Dhabi Read more Project Rock installation, PDET the Boskalis NINA (No Injuries No Accidents) program was implemented; all truck drivers and other personnel were successfully trained and explained the values Read more Project Salvage operation, Full City fuel oils and other pollutants out of the holds and tanks by means of skimming and pumping. The recovered pollutants were transported to shore Read more Project Dredging and reclamation, Port of Peterhead , together with split hoppers Long Sand and Cork Sand. Other associated works included the demolition of the western end of the existing Albert Quay before Read more Project Construction drilling island and ice barriers, Kazakhstan with a total length of 450 meters and 20 meters wide, and the other measuring more than 550 meters. BAVOF also built Riser Island, measuring 550 x 90 meters Read more Previous 27 28 29 30 31 Next