Filter search results (357) Project Port development, Tanger Med 2 Port development, Tanger Med 2 Tanger-Med is a cargo and passenger port located about 40 km east of Tangiers, Morocco, on the Straits of Gibraltar at the crossing of two major maritime routes only 15 km from the European mainland. The port consists of the Tanger Med 1 terminal, which went into service in 2007, a ferry terminal (2009), and the Tanger Med 2 port, which has been under construction since March 2010 and is scheduled Read more Project Creation bird island, Le Havre port 2000 the top layer (mainly sand). The Cyrus took over for the rougher gravel part. Cyrus began by dredging for the new berths. The dredging required for Berths 1 Read more Project Dredging, reclamation, reconstruction and environmental monitoring works, Vilufushi of 1 million m3 of coral sand from the reef to increase the surface of, and raise, the island. Construction of a 2000 meter rock revetment around Read more Page 3D printed reefs an outer dimension of 2 meters in diameter and 1 meter in height, and at a glance resembles a mushroom. Each unit will weigh approximately 2.5 tons Read more Project Hurricane Rita original position and she is now 1.3 NM off the beach. In June 2007 'Taklift 1' and 'Smit Cyclone' removed one of the three legs of the 'Adriatic VII Read more Project Eastbourne Beach Recharge , with the aim of achieving a design crest width and height with seaward slopes of approximately 1 in 9. All dry earth moving was subcontracted to Ovenden Read more Previous 31 32 33 34 35 Next