Filter search results (449) Project CDC compaction for UK Battery Industrialization Centre CDC compaction for UK Battery Industrialization Centre Cofra Ltd compacted 12,500 m2 for the development of a new warehouse in 2019. Coventry Read more Project Liner installation for Incinerated ashes depot for N62 road, The Netherlands Liner installation for Incinerated ashes depot for N62 road, The Netherlands We have installed 90,000m2 of liner to cover incinerated ashes embankments in 2019 on the N62. Liner installation is part of our segment barriers. Nieuwdorp Read more Project CRC compaction for the Hartel Tank Terminal CRC compaction for the Hartel Tank Terminal We have used our CRC roller to compact backfilled material up to a depth of 3m on the Hartel Tank Terminal in Rotterdam in 2019. Rotterdam Read more Project PVD for tailing pond remediation, France PVD for tailing pond remediation, France Cofra has installed vertical drains for the remediation of a tailing pond in 2019. PVD installation is part of our segment consolidation. Read more Project PVD installation Matarbari USCC Power Plant Project, Bangladesh PVD installation Matarbari USCC Power Plant Project, Bangladesh In 2018 and 2019, we installed over 10,000,000m1 of prefabricated vertical drains, with an installation depth up to 25m. PVD installation is part of our segment consolidation. Cofra B.V. Read more Project PVD installation for housing estate West Hythe phase 1-6, UK PVD installation for housing estate West Hythe phase 1-6, UK Between 2016 and 2019, Cofra Ltd installed around 400.000 m1 of prefabricated vertical drains, each year. PVD installation is part of our segment consolidation. West Hythe Cofra ltd Read more Previous 34 35 36 37 38 Next