Filter search results (454) Project CRC compaction for the Hartel Tank Terminal CRC compaction for the Hartel Tank Terminal We have used our CRC roller to compact backfilled material up to a depth of 3m on the Hartel Tank Terminal in Rotterdam in 2019. Rotterdam Read more Project PVD for tailing pond remediation, France PVD for tailing pond remediation, France Cofra has installed vertical drains for the remediation of a tailing pond in 2019. PVD installation is part of our segment consolidation. Read more Project PVD installation Matarbari USCC Power Plant Project, Bangladesh PVD installation Matarbari USCC Power Plant Project, Bangladesh In 2018 and 2019, we installed over 10,000,000m1 of prefabricated vertical drains, with an installation depth up to 25m. PVD installation is part of our segment consolidation. Cofra B.V. Read more Project PVD installation for housing estate West Hythe phase 1-6, UK PVD installation for housing estate West Hythe phase 1-6, UK Between 2016 and 2019, Cofra Ltd installed around 400.000 m1 of prefabricated vertical drains, each year. PVD installation is part of our segment consolidation. West Hythe Cofra ltd Read more Project PVD installation Tuas Finger One reclamation, Singapore PVD installation Tuas Finger One reclamation, Singapore Between 2016 and 2019, we installed 5,800,000m1 of prefabricated vertical drains, with an installation depth up to 35m. PVD installation is part of our segment consolidation. Tuas Read more Project PVD installation for Mombasa port expansion PVD installation for Mombasa port expansion In 2013, we installed 5,000,000m1 of prefabricated vertical drain, with an installation depth up to 32m. In 2019, a second phase was executed with 3.300.000m1 of drain. PVD installation is part of our segment consolidation. Mombasa Read more Previous 35 36 37 38 39 Next