Project
Jotun A
Jotun A The Jotun A FPSO, a 92,000 DWT FPSO capable of producing 70,000 bpd, began producing in 1999 on the Jotun field (Norway). As part of Vår... project will extend the life of the field (PL 001) by 2045, giving Norway’s oldest license a lifetime of 80 years. Boskalis performed the engineering... and capability one of the few sheerlegs capable to execute same is the Taklift 4. The lifting was executed in Stavanger (Norway) by the Taklift 4 with 30