Filter search results (872) Project NOMO wrecks NOMO wrecks SMIT Salvage was awarded the contract for the removal of two very old wrecks in the Dutch section of the North Sea by Rijkswaterstaat...' and 'SMIT Barge 7', plus two support tugs. For the removal of the first wreck one of SMIT’s large salvage grabs was used to pick up the wreck pieces and debris from the IJgeul, one of the channels into the port of Rotterdam. Wreck pieces were lifted on a barge. SMIT Salvage removed the wreck and debris Read more Project Offshore wind farm, LINCS Offshore wind farm, LINCS SMIT Transport is transporting the wind turbine foundations for the new Lincs Offshore Windfarm, situated off Great... households. During the months April to November 2011, three Smit barges transported the wind turbine foundations, consisting of monopiles... multipurpose vessels, the Smit Bison, Smit Beluga and Smit Buffalo, supported the loading and ballasting operations. In November, SMIT’s participation Read more Project Salvage operation, Sep Orion Salvage operation, Sep Orion In 2012 SMIT Salvage successfully removed the diesel oil from the grounded jack-up work platform SEP Orion at Sao Luis, Brazil. SMIT Salvage was also awarded the wreck removal contract. Floating sheerleg Taklift 4 was used as a work platform, using underwater... were removed. The platform was towed out in a stable condition. Sao Luis, Brazil SMIT Salvage Read more Project Oil and wreck removal JBB Derong 19 the collision, the dredger capsized and was partially submerged. SMIT Salvage was contracted for the initial response to recover any pollutant material... by sheerleg SMIT Cyclone on to barges. The sections were delivered to a scrap yard in Singapore for further safe dismantling. Benzmark Development Singapore Strait SMIT Salvage Singapore BIMCO Wreck removal contract Read more Project Heavy lift operations, Rion Antirion bridge the bridge deck is suspended. SMIT was involved in two phases of the project. During the construction of the pylons, SMIT carried out the management for the tow-out and positioning. For the installation of the steel components SMIT carried out the heavy lift operations. The heavy lift operations... longboom. Equipment: Floating Sheerlegs Taklift 7 with 130 / 175 m jib and tug Zeeleeuw. Gulf of Corinth, Greece SMIT Salvage, Transport & Heavy Lift Read more Project Raissa . The rig then suffered a severe stern trim and portside list. SMIT Salvage was contracted to recover the derrick and refloat the Raissa. Firstly, the 1,000Mt sheerlegs SMIT Cyclone was used to recover both the derrick and pipes. To refloat the Raissa, a combination of air pressurizing, pumping and lifting was used. Firstly, all the flooded tanks were pumped dry and pressurized to create buoyancy, after which the SMIT Cyclone was connected Read more Previous 62 63 64 65 66 Next