Filter search results (62) Press release Q3 Trading Update: Boskalis maintains full year outlook of 2008. At the same time we have seen new production capacity coming onto the market in the past few years. This puts pressure on both volumes Read more Press release Boskalis posts good result despite challenging market conditions faced with stagnating demand as a result of the cyclical downturn at the end of 2008. At the same time we have seen new production capacity coming Read more Press release Boskalis raises 2013 net profit outlook to at least EUR 360 million of the cutter fleet was lower. In the third quarter a result was realized on the Port Rashid project that was prematurely concluded in 2008. At the time losses Read more Press release Boskalis reports record result for 2010 few years we have been faced with stagnating demand as a result of the cyclical downturn at the end of 2008. At the same time we have seen new Read more Press release Boskalis launches public offer for Smit of Smit and the financial information of Smit relating to the annual financial statements (jaarrekening) for the financial year 2008, the financial Read more Project PVD installation LNG plant Soyo reclamation PVD installation LNG plant Soyo reclamation In 2008, we installed 2,300,000m1 of prefabricated vertical drains, with an installation depth up to 25m. PVD installation is part of our segment consolidation. Soyo Read more Previous 5 6 7 8 9 Next