Filter search results (1049) Project Brighton and Hove Outfall cleaner seas to Sussex. The subcontract was awarded to a joint venture between Westminster Dredging and Land & Marine for the assembling and installation of the outfall pipeline. Westminster Dredging carried out the dredging of the trench and Tunnel Boring Machine (TBM) reception pit, assisted... Dredging supplied and transported the 60-300kg rock for placement as protection to the top of the diffuser domes and assisted with the recovery of the TBM Read more Project Port reconfiguration, Felixstowe Port reconfiguration, Felixstowe Capital dredging and filling works for new quay development (previously known as Landguard Redevelopment). Phase 1... in front of old Landguard port structures and redevelopment of the old Landguard terminal. Work for WDC included dredging approximately 6.1 million m3 consisting of: Dredging of silts and soft clays within reclamation terminal footprint (approx. 50,000 m3); Reclamation works to fill the area between Read more Project Port development, Lerwick . The 2008 dredging and reclamation works were one of the largest marine projects to be carried out in Scotland in recent years and constituted the largest single investment in the port to date. The works were executed by Westminster Dredging Co. Ltd., they designed, procured and project managed the dredging and reclamation project to remove in excess of 500,000 m3 of bulked dredge fill to create improved deepwater access (-9 m CD Read more Page Links Links On this page we provide you with a number of links to websites of other Boskalis companies, and journals that supply information on dredging and related activities. Read more Project Barrow Maintenance Dredging Barrow Maintenance Dredging Our ongoing work in Barrow provides maintenance dredging of the Barrow approach channel ensuring the safe navigation and exit of Astute Class Nuclear Submarines. The contract requirements include strict dredging parameters together with a fixed deadline for the exit and includes for 5 non-critical and 3 critical dredging campaigns. With the total volume to be removed to achieve required design level only known upon Read more Project Tyne Capital Dredging Tyne Capital Dredging The 2011 campaign project, performed by Westminster Dredging, consisted of capital dredging, with the River Tyne being dredged from the harbour entrance over a distance of 5.5km to a depth of -10m CD. Furthermore, the berth on the south bank (Tyne Bulk Terminal) was dredged... being brought on shore during these operations. The dredging campaign was finished on July 26th 2011. Port of Tyne Westminster Dredging Company Ltd Read more Previous 75 76 77 78 79 Next